By 1992 --- less than four decades after opening --- deterioration in the wood beams supporting the space for worship was noted. It was determined that repairing the structure would not be economical when everything involved was taken into account.
The original building was not equipped for the physically challenged, there was a definite lack of meeting space in the aging building and the growing population in the Byron suburb of London meant the church should be larger.
Clearly a new building was demanded. The last service in original church was held in January 1998. By April 1999 the first service was held in the present, much larger and much more traditional looking structure.
2 comments:
Very nice and interesting! Beautiful art!
Looks like a beautiful church - love the stained glass window!
Post a Comment